Guide · By Brandon Bone, owner, First Due Construction
Roof Replacement Day: What to Expect
Before the crew arrives
- Move cars out of the garage and driveway.
- Take pictures and fragile items off walls on the top floor; hammering vibrates the house.
- Move patio furniture and grills away from the house.
- Keep pets and kids inside or away for the day.
Delivery
Shingles and materials are usually delivered a day or two before, often onto the roof by boom truck. A dumpster is placed in the driveway or yard.
Tear-off and deck repair
The old roof comes off down to the deck. We inspect the sheathing and replace any rotted sections, as described in your proposal.
Dry-in
Drip edge, leak barrier and underlayment go down, so the house is protected even before shingles.
Shingles, flashing and ventilation
New flashing, pipe boots, shingles, ridge vent and ridge caps finish the system.
Cleanup
We clean gutters, pick up debris and run a magnet across the yard and driveway for nails.
Walk-through
Brandon walks the job with you, and we register your warranty if the roof qualifies. Questions? See roof replacement.